Radhames A. Tolentino-Pena

Learn More
A dynamic simulation-based crashing method is introduced in this research to evaluate project networks and determine the optimum crashing configuration that minimizes the average project cost due to lateness penalties and crashing costs. This dynamic approach will let the user evaluate the project network to determine a crashing strategy at the beginning of(More)