Philipp Puntel Schmidt

Learn More
To test the control code of an automated manufacturing system, virtual commissioning (VC) can be employed: the binary input and output signals of the controller (usually a Programmable Logic Controller, PLC) are connected with a simulation model of the plant. To resemble the physical behavior of the plant and of the sensors and actuators, the simulation(More)
The planning and layout of a building automation system is a complex process characterized by the selection, application and interconnection of multiple different functions. Planning mistakes are often not recognized before the initial operation of the building. In order to allow an earlier fault and function analysis and to ease planning, an approach for(More)
The planning and layout of a building automation and control system (BACS) is a complex process characterised by the application and interconnection of several different functions. Such a complex process is prone to planning errors that are often only recognised during the initial operation of the building. In order to guarantee earlier fault detection and(More)
  • 1