Nida Chatwattanasiri

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
The Generation Expansion Planning (GEP) problem applies to the expansion of the electricity generation network with new power plant investments. It is a multi-objective optimization problem where the level of uncertainty is very high because of its spatial dimensions and time scale. Therefore, it becomes necessary to introduce in the decision making process(More)
This paper develops a two-stage stochastic cost-reliability optimization model for multi-component systems subjected to uncertain stress exposure which leads to uncertain component and system degradation and wear. Optimization models are used for making decisions of system configurations to be applied in different and occasional diverse future usage(More)
The paper describes and develops an application of component partnership design for dynamic k-out-of-n system reliability. This alternative k-out-of-n system perspective expresses the new reliability model configured with component partnerships that is applied to actual network design problems requiring high fault tolerance. A telecommunication application(More)
  • 1