Natalia Moreno Palli

Learn More
This paper presents a work-in-progress on the response time variability problem. This problem occurs whenever events, jobs, clients or products need to be sequenced so as to minimize the variability of time they wait for their next turn in obtaining the necessary resources. The problem has numerous real-life applications, which will be briefly reviewed. The(More)
In this paper, we consider the minmax product rate variation problem (PRVP), which consists in sequencing copies of different products on an assembly line in such a way that the maximum value of a discrepancy function between actual and ideal productions is minimum. One means of solving this problem lies in its reduction to a bottleneck assignment problem(More)
  • 1