Narasimha B. Kamath

Learn More
The supply chain under consideration is a two-echelon system consisting of a retailer and a manufacturer. The N different products face stochastic demand at the retailer and are produced using a shared facility at the manufacturer. Production changeover involves setup time that is significantly higher than the processing time. A cyclic polling model with(More)
  • 1