Murat Gunduz

Learn More
Increasing competitiveness in engineering industry pressurizes companies to improve productivity of every single element in processes. As a result of this pressure, increasing productivity of design staff and design systems is systematically investigated by industry professionals and researchers. Design reuse appears as an effective approach to increase(More)
The purpose of this paper is to develop an understanding about the internal fraud and corruption problem in the Turkish construction industry. The reasons behind the internal fraud and corruption problem as well as the types of prevention methods were investigated; and as a result various recommendations were made. To this end, a risk awareness(More)
Due to high number of design parameters and complexity of construction, hydroelectric power plant project costs are affected by many parameters. In this paper, 54 feasibility reports of hydroelectric power plant (HEPP) projects are analyzed. A database is constructed that has the project costs, design parameters and project features. The data set is(More)
  • 1