Learn More
In this work a model-based methodology to solve an integrated process design and control (IPDC) problem for a bioethanol production process is presented. The IPDC problem is formulated and solved such that the economic performance is optimized in terms of a cost effective design and controllable process. The concepts of attainable region (AR) and driving(More)
  • 1