Michel Turcotte

Learn More
This paper illustrates the use of simulation for evaluating and analyzing air cargo operations at one of the new state-of-the art cargo facilities at Toronto Pearson Airport. The establishment of a facility equipped with some of the latest in modern material handling systems available today and a computerized-based inventory control system that interfaces(More)
Along with marketing and maintenance implications, hub optimization is an important part of the flight schedule development process. The Air Canada flight schedule at its Toronto hub is based on two-hour non-directional connection banks. The purpose of this research is to analyze an alternative to this rule consisting of directional connection banks and,(More)
  • 1