Michael Turega

Learn More
It is known that well over 50% of replacement projects fail. Requirements gathering go someway to contributing to this statistic; if the requirements we gather for the new system do not match those of the system to be replaced then the project is bound to fail, at least in part. This paper proposes an empirical metric that assists measuring the confidence(More)
  • 1