Mengying Fu

Learn More
In order to process a product in a semiconductor back-end facility, a machine needs to be qualified first by having a product-specific software program installed on it. Then a tool set must be available and attached on the machine while it is processing the product. In general not all machines are qualified to process all products due to the high machine(More)
We present a framework for capacity allocation decisions for Assembly-Test (A-T) facilities that is comprised of an optimization model and a simulation model. The optimization and simulation models are used iteratively until a feasible and profitable capacity plan is generated. The models communicate using an automated feedback loop and at each iteration(More)
  • 1