With their consistent production line load increments, the possibilities of substation congestion problems in the integrated steel companies are inevitable. To meet these power demands, well-organized system infrastructure expansion plans must be designed in advance. An alternative scheme to alleviate some short-term facility overload problems is to(More)
With their consistent production line load increments, the possibilities of substation congestion problems in the integrated steel companies are inevitable. To meet these power demands, well organized system infrastructure expansion plans must be designed in advance. An alternative scheme to alleviate some short-term facility overload problems is to(More)