M.T. Ramezani

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Sorry, we do not have enough data to show an influence graph for this author.
Learn More
In this paper installation and testing operation of the submarine power, control and fibre optic cable between SPP1 production platform and SPD2 satellite wellhead platform of South Pars Gas Field Development - phase1, will be reviewed. The South Pars Gas Field Development has been conceived for the exploitation of gas and condensate reservoirs located in(More)
In this paper, transportation and float over installation operation of SPQ1 living quarters platform on designated 6 legged jacket, by "SADRA FLB 124" barge, will be reviewed. The living quarters platform SPQ1 forms the accommodation for the development complex, and has a weight about 3750 tonnes and plan dimensions of 34 m /spl times/ 31 m. The main items(More)
  • 1