-In this paper, we continue to analyze optimal dispatch of generation and transmission topology to meet load as a mixed integer program (MIP) with binary variables representing the state of the transmission element (line or transformer). Previous research showed a 25% savings by dispatching the IEEE 118 bus test case with a DCOPF. This paper is an extension(More)
Currently, there is a national push for a smarter electric grid, one that is more controllable and flexible. The full control of transmission assets are not currently built into electric network optimization models. Optimal transmission switching is a straightforward way to leverage grid controllability: to make better use of the existing system and meet(More)
-In this paper, we continue to analyze optimal dispatch of generation and transmission topology to meet load as a mixed integer program (MIP) with binary variables representing the state of the transmission element (line or transformer). Previous research showed a 25% savings by dispatching the IEEE 118 bus test case. This paper is an extension of that(More)
Currently, there is a national push for a smarter electric grid, one that is more controllable and flexible. Only limited control and flexibility of electric assets is currently built into electric network optimization models. Optimal transmission switching is a low cost way to leverage grid controllability: to make better use of the existing system and(More)
Traditionally, transmission assets for bulk power flow in the electric grid have been modeled as fixed assets in the short run, except during times of forced outages or maintenance. This traditional view does not permit reconfiguration of the transmission grid by the system operators to improve system performance and economic efficiency. The current push to(More)
Currently, there is a need to plan and analyze the electric power transmission system in greater detail and over larger geographic areas. Existing models approach the problem from different perspectives. Each model addresses different aspects of and has different approximations to the optimal planning process. In order to scope out the huge challenge of(More)
There is currently a national push to create a smarter, more flexible electrical grid. Traditionally, network branches (transmission lines and transformers) in the electrical grid have been modeled as fixed assets in the short run, except during times of forced outages or maintenance. This traditional view does not permit reconfiguration of the network by(More)
As power systems become more reliant on intermittent resources, system operators are faced with the fact that the availability of intermittent resources is beyond human control and largely unpredictable. Due to the lack of compliance from intermittent resources to follow strict dispatch instructions, the dispatch instruction for an intermittent resource is(More)
We present a parallel implementation of three transmission switching algorithms. The first is based on a parallel search of all candidate lines, the second is based on a priority listing of lines and the third is based on decomposing the set of candidate lines in smaller subsets that are solved in parallel. We present a duality result that justifies the(More)