Kiyoshi Goto

  • Citations Per Year
Learn More
A new control scheme (the 2-ACR method) for parallel multiterminal HVDC systems is proposed. The method does not require fast communication systems. Any terminal can be disconnected or connected to the system without power re-coordination, since a new stable operating point can be always determined automatically by control actions of each converter with two(More)
Tokyo Electric Power Company is studying a 15 GW future system expansion. The added generation will be concentrated in a nuclear energy park, connected by a limited number of transmission corridors to the load center in the Tokyo urban area. One study reported in this paper to support this expansion is the determination of the UHV power transfer limits(More)
  • 1