Kenneth Omahen

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
This paper considers deterministic scheduling problems for systems having a nUmber of different resource types and an arbJtrary number of units of each resource. General results are obtained for preemptive-resume scheduling rules under the condition of zero preemption costs. Schedule completion time 15 the objective function considered, and the paper(More)
The hardware architecture for a large data base application often involves the use of movable-head disk modules for auxiliary memory. This paper considers design calculations for such systems and is divided into two main sections described below. A survey is given of literature dealing with queueing models for multiple-module movable-head disk(More)
  • 1