Johannes F. Verstege

  • Citations Per Year
Learn More
One major task of the control centre operator is to identify the global system state of the transmission system. However, during the past couple of years, the complexity of transmission system operation has increased significantly. The operator in the control room has to observe wider external areas to fully evaluate system security. Along with the(More)
This paper reports on a method for long-term operations planning in combined heat and power supply systems with a planning horizon of up to 15 months. Solutions to the special problems of modelling either energy supply contracts and electrical and thermal loads within a Mixed-Integer-Linear Programming approach are suggested. Additionally a method is(More)
During the past couple of years, the complexity of transmission system operation has increased significantly. Along with the liberalization of the electricity markets a broad range of new, varying tasks have arisen and with this a growing number of interfaces which the control centre operator has to cope with. Furthermore the substantial growth of volatile(More)
  • 1