Huilin Yuan

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
The overall project schedule is the basement of construction project. Any problem in it will cause huge economic loses, and it must be checked before being implemented. This paper introduces real value into DSM (design structure matrix), proposes a new checking and sorting method, and designs detailed processes and rules. Additionally the effectiveness of(More)
With the limit of compiling environment, the beans technique before couldn't meet the requirement of improving reusing, maintenance and multi-platform used of software. This paper introduces the design of the function level in system structure based on the Web and the application in Logistics Management System. The level consists of some JavaBeans that can(More)
  • 1