Huicheng Zhou

Learn More
Aiming at defect points in CL points gernerated by CAM, fast CL points pre-processing algorithm was proposed. The defect poinnts were divided into different types including flaw point, S shape and back traverse, the uneven length of the adjacent distance, and each case was identified and corrected by the proposed algorithm. The efficiency and effectiveness(More)
Mid- and long term hydrologic forecasting of drainage area is a difficult issue in engineering design and hydrological process simulation. Combined with wavelet neural network (WNN) to calculate and forecast the weight of model, fuzzy recognition model (FRM) is used to fit and predict mid- and long term hydrological phenomena, and the regression equation(More)
  • 1