Hongquan Xue

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
—Flexible job-shop scheduling problem derived from the job-shop scheduling problem, and is more realistic than the job-shop scheduling problem in the manufacturing enterprise. It should be utilized with high efficiency. But it is a multi-objective optimal problem. Three minimization objectives (Maximum completion time (makespan), Total workload of machines(More)
  • 1