Harlem Mauricio Madrid Villadiego

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
This paper considers the Flowshop Sequence Dependent Group Scheduling (FSDGS) problem In this problem, the n jobs to be processed on m machines are grouped in families (or groups) in a way that a machine setup time is needed between two consecutive jobs of different groups. The purpose of this problem is to determine the sequence of the groups and the(More)
  • 1