Hanbing Qu

  • Citations Per Year
Learn More
During power system restoration, the maximum load amount that a substation can pick up at one time is a critical parameter to be determined. Many factors should be considered, such as frequency constraint, transient voltage-dip constraint, steady-state voltage constraint and cold load pickup. This paper proposes a general model for calculating the maximum(More)
  • 1