Learn More
Long run average costs for finite production rate model with backlogging is less than or equal to that of the same model without backlogging. An equation for calculating intangible backorder cost is proposed for situation when required service level is not attainable. By incorporating this intangible backorder cost in mathematical analysis, one can derive a(More)
A 45nm NOR flash technology featuring a self aligned contact ETOX architecture is demonstrated on a 1 Gbit MLC product having a die area of 30.05mm<sup>2</sup>. The cell size of 0.024&#x003BC;m<sup>2</sup> is the smallest NOR cell reported to date and is manufactured entirely with dry lithography tools. With an aggressively scaled drain space of 100nm and(More)
  • 1