Learn More
During the IEEE P802.3ba 40Gb/s and 100Gb/s Ethernet project, it was observed that the bandwidth requirements for core networking and computing applications were growing at different rates, driving the need to develop the two new wireline Ethernet speeds. In order to maintain an ongoing understanding of the industry bandwidth trends, the IEEE 802.3 Ethernet(More)
  • Charles Ahlfeld, Tom Burke, +16 authors Pat Schweiger
  • 2012
– The conceptual design of a 1200 MW thermal, 500 MW electrical, Traveling Wave Reactor (TWR) Plant has been completed with the objective of completing construction and startup by 2020. The reactor is a pool-type, sodium-cooled fast reactor and has been named TerraPower – 1 (TP-1). The TP-1 core will operate for over 40 years without refueling, but(More)
  • 1