Learn More
In practice because of ignorance of an residual time before the next parameters abnormalities it is not undertaken measures for prevention of negative events (failures, accidents, damages and-or the(More)
For many transport systems a necessity of performing in time a set of heterogeneous repair work exists. Several works should be performed by one repair brigade in crossed time. And conditions for(More)