• Publications
  • Influence
Solid waste management challenges for cities in developing countries.
Solid waste management is a challenge for the cities' authorities in developing countries mainly due to the increasing generation of waste, the burden posed on the municipal budget as a result of theExpand
  • 891
  • 42
  • PDF
Mechanising, Robotising and Automating Construction Processes
Building objects are produced by people who perform the necessary tasks using equipment. On the basis of preconditions, the process designer can have a particular task performed by a specificExpand
  • 6
  • PDF
Shared experiences: Management of experiential knowledge in the building industry
TLDR
An approach based on design methodology is suggested to better structure planning (both work and output). Expand
De Bolder , an unusual example of off-site construction by
De Bolder (“The Bollard”) is a 42.5 metre-high building with a circular cross-section of 30 metres and a weight of 25,000 KN. It was built in an industrial plant, transported a considerable distanceExpand
Productivity in Rail Construction: Lessons Learned from the Development of the RHEDA 2000 Track Construction System
Between Amsterdam and Antwerp a new High Speed Rail link with the length of 96 KM is under construction and will be opened in April 2007. Based on the existing Rheda Ballastless Track constructionExpand
  • 2
  • PDF