Electric power requirements for the Boston Harbor project are addressed. A discussion regarding the use of CAD for the development of design and drawings of a 115 kV submarine power cable is given. Using CAD enabled rapid production of bid, contract, and construction drawings to meet tight scheduling requirements. The software used in this project is(More)