Ebbe G. Negenman

Learn More
This paper contributes to the development of models for capacity constrained Supply Chain Operations Planning (SCOP). We focus on production environments with arbitrary supply chain structures. The demand for the end items is assumed to be exogenously determined. We solve the SCOP problem with Linear Programming models using planned lead times with(More)
The multiprocessor ̄ow shop scheduling problem is a generalization of the ordinary ̄ow shop scheduling problem. The problem consists of both assigning operations to machines and scheduling the operations assigned to the same machine. We review the literature on local search methods for ̄ow shop and job shop scheduling and adapt them to the multiprocessor(More)
  • 1