• Publications
  • Influence
FACED ISSUES IN REA3 QUARTER-WAVE RESONATORS AND THEIR SUCCESSFUL RESOLUTION*
The 80.5 MHz, beta=0.085 QWR production cavities for the ReA3 project at MSU have initially shown puzzling behaviour and unexpected lack of performance. This was due to a combination of designExpand
  • 7
  • 1
  • PDF
FRIB Project: Moving to Production Phase
The Facility of Rare Isotope Beams (FRIB) project was presented in SRF2013 [1]. This paper reports the progressed situation of this project since SRF2013. FRIB project is now moving to productionExpand
  • 4
  • PDF
Testing of Copper Plating Quality on ReA3 Coupler Bellows and Approach to Improved Plating for FRIB Production
The SRF community faces difficulties finding sources for repeatable, high quality copper plating for fundamental power coupler (FPC) components. The copper plating of ten small custom bellows ofExpand
  • 3
  • PDF
Experiences of Superconducting Radio Frequency Coldmass Production for the FRIB Linear Accelerator
The superconducting radio frequency (SRF) portion of the Facility for Rare Isotope Beams (FRIB) linear accelerator consists of 46 cryomodules of 6 different types. Each cryomodule contains a coldmassExpand
  • 2