Daniel J. Borello

Learn More
The bridge consisted of three 42 feet precast prestressed concrete deck beams simply-supported by concrete pile caps with a timber pile foundation. Assessment based on site investigation, in situ readings, and analysis indicated that a geotechnical or superstructure failure may be ruled out. Samples of the oak timber piles were retrieved and tested under(More)
  • 1