Daniel Herzer

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
A 45-L pilot MFC system, consisting of four single-chamber membraneless MFCs, was integrated into a full-scale wastewater treatment plant (WWTP) and operated under practical conditions with the effluent of the primary clarifier for nine months to identify an optimal operational strategy for stable power output and maximum substrate based energy recovery(More)
  • 1