Learn More
The Transmission System Operator (TSO) is responsible for the power system operation. It has to provide the transmission network maintenance and development, having as a goal the safety, reliable and economical operation of the power system. Additionally, it has to fulfil the environment constraints and, most important, to support the development of the(More)
as thesis coordinator. The thesis has the following title: " Contributions to the forensic and legal study regarding the consequences of the iatrogenic lesions of the main biliary pathways occurred during the laparoscopic approach of hepato-bililary surgery ". All authors have read and approved the final manuscript and also declare no conflicts of interest.(More)
This material is part of a lager study of a PhD studies thesis, currently under development by Rarinca Abstract Introduction: Even though the development of the recent anti-parasitic drugs has led
  • 1