Learn More
It is quite difficult to adapt to the changing production scheduling problem for an algorithm of a certain question. According to this, a strategy of dynamic integrated iterative search algorithm is proposed. Firstly, the relationship model of production problem and algorithm is built. Secondly, the framework of the iterative search algorithm is proposed.(More)
  • Cunli Song
  • 2009
—An assorted dynamic Job-Shop scheduling algorithm based on impact degree is proposed in this paper. According to the craft's constraint relations among jobs to be processed, the craft trees are drawn first, there will be N or more than N craft trees for N-jobs, and then the length of each craft tree's critical path should be calculated. The longer the(More)
  • 1