Learn More
Almost all SoC designs today use hardware prototyping at some point of the development cycle to perform hardware/software validation or test interfaces to real-world stimulus. Recently, virtual prototypes have emerged as a way to run system level tests and perform hardware/software co-simulation before silicon or hardware prototypes are available. Does the(More)
The muon pretrigger system of the HERA-B experiment is used to find muon track candidates as one of the inputs of the first level trigger system (FLT). Due to the interaction rate of 40 MHz required to achieve an accuracy of 0.17 on sin(2β) after one year of running the total input of the muon pretrigger system is about 10 GByte/s. The latency to define(More)
  • 1