Chuck Cruse

Learn More
Almost all SoC designs today use hardware prototyping at some point of the development cycle to perform hardware/software validation or test interfaces to real-world stimulus. Recently, virtual prototypes have emerged as a way to run system level tests and perform hardware/software co-simulation before silicon or hardware prototypes are available. Does the(More)
We have searched for Theta+(1540) and Xi(--)(1862) pentaquark candidates in proton-induced reactions on C, Ti, and W targets at midrapidity and square root of s = 41.6 GeV. In 2 x 10(8) inelastic events we find no evidence for narrow (sigma approximately 5 MeV) signals in the Theta+ --> pK0(S) and Xi(--) --> Xi- pi- channels; our 95% C.L. upper limits (UL)(More)
The muon pretrigger system of the HERA-B experiment is used to find muon track candidates as one of the inputs of the first level trigger system (FLT). Due to the interaction rate of 40 MHz required to achieve an accuracy of 0.17 on sin(2β) after one year of running the total input of the muon pretrigger system is about 10 GByte/s. The latency to define(More)
Inclusive differential cross sections dσpA/dxF and dσpA/dp 2 t for the production of K 0 S , Λ, and Λ̄ particles are measured at HERA in proton-induced reactions on C, Al, Ti, and W targets. The incident beam energy is 920 GeV, corresponding to √ s = 41.6 GeV in the proton-nucleon system. The ratios of differential cross sections dσpA(K 0 S)/dσpA(Λ) and(More)
  • 1