Chin-Hui Tsai

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
The majority of the scheduling studies carry a common assumption that machines are available all the time. However, machines may not always be available in the scheduling period due to breakdown or preventive maintenance. Taking preventive maintenance activity into consideration, we dealt with the twomachine flowshop scheduling problem with makespan(More)
  • 1