Chen De-yun

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
Aiming at the integrated flexible scheduling problem that complex products with No-Wait constraint conditions between procedures, an algorithm which combines the procedures with No-Wait constraint conditions and its predecessor into a virtual node set is proposed. For standard flexible procedures, the allied critical path method is taken to confirm the(More)
  • 1