• Publications
  • Influence
Identification of Different Bile Species and Fermentation Times of Bile Arisaema Based on an Intelligent Electronic Nose and Least Squares Support Vector Machine.
Fermentation is one of the most traditionally utilized methods to process the raw materials of traditional Chinese medicine (TCM). Bile Arisaema (BA) is produced by the fermentation of the roots ofExpand
  • 5
Analysis on Highway Project Construction Enterprises Profit Way
With the further improve of highway project cost management system, the contract price and the determine of construction drawing budget cost of highway project is clearly visible, which largelyExpand
Research on Highway Project Sustainable Development Evaluation under the Perspective of Engineering Philosophy
According to the status of the highway project, and combining with the significance of engineering philosophy, the paper determines the sustainable development evaluation index, using the entropyExpand
The Cost Control Based on the Whole Process Management of Hydraulic Engineering Construction
The whole process cost management of hydraulic engineering construction is studied through project supervision, the elements and reasons of impacting cost control in construction stage is analyzed,Expand
Identification of different species of Zanthoxyli Pericarpium based on convolution neural network
TLDR
Zanthoxyli Pericarpium (ZP) are the dried ripe peel of Zanthoxylum schinifolium Sieb. Expand