C. E. Whitmer

Learn More
– The conceptual design of a 1200 MW thermal, 500 MW electrical, Traveling Wave Reactor (TWR) Plant has been completed with the objective of completing construction and startup by 2020. The reactor is a pool-type, sodium-cooled fast reactor and has been named TerraPower – 1 (TP-1). The TP-1 core will operate for over 40 years without refueling, but(More)
  • 1