In a typical LCD factory, a large number of product types are produced concurrently, 24 hours a day and 365 days a year, and there exist various constraints and re-entrant flows in the manufacturing processes. As a result, efficient planning and scheduling of LCD production is a big challenge. Presented in this paper is a simulation-based DPS (daily(More)
In a typical FAB factory, various types of products are produced around the clock. Complex constraints and re-entrant flows make it difficult for a human scheduler to generate a production schedule based on his/her experience and knowledge. This paper introduces a simulation based FAB scheduler, SeePlan®, which was developed by the authors. A Korea based(More)
Diversified and complicated manufacturing sites make optimal scheduling of production lines difficult. Under current manufacturing processes, it is almost impossible for schedulers to consider all the constraints of production processes. A strategy of simulation-based advanced planning and scheduling (APS) is employed to overcome difficulties that interfere(More)
  • 1