Learn More
In a current high competitive business environment, cost estimation is a strategic tool in order to make decisions related to products during their design and development phases. Against traditional estimation methods, that needs to wait until the technical description of the product is completed, there exist new methods allowing to estimate the cost(More)
This paper proposes various lower bounds to the makespan of the flexible job shop scheduling problem (FJSP). The FJSP is known in the literature as one of the most difficult combinatorial optimisation problems (NP-hard). We will use genetic algorithms for the optimisation of this type of problems. The list of the demands is divided in two sets: the actual(More)
  • 1