Bao-Hong Li

Learn More
The demands for fresh process waters and heating/cooling utilities arise intermittently in batch plants. Due to equipment constraints, the quality and flow-rate of each resulting wastewater stream are required to be controlled within specified limits before treatment/regeneration. In this paper, a general mathematical programming model is developed to(More)
  • 1