Bageshri Sathe

Learn More
s Design flood estimates have been carried out for Upper Krishna basin catchment employing flood frequency analysis methods for planning and or infrastructure design. This method consists of fitting a theoretical extreme-value probability distribution to the maximum annual flow rate data collected at a stream flow gauging station, thus enabling the(More)
  • 1