Ashkan Mozdgir

  • Citations Per Year
Learn More
This paper addresses the two-stage assembly flow-shop scheduling problem with non-identical assembly machines at the second stage to minimize a sum of holding and delay costs. Although there are more than one assembly machine in many manufacturing systems, to the best of our knowledge, the two-stage assembly flow-shop scheduling problem (TSAFSP) has never(More)
  • 1