Learn More
The difficulties to build new power lines within the national territory cause of authorization problems, and the ever more growing production of electricity from renewable sources, induces Term S.p.A. (Italian TSO) to take advantage of existing overhead transmission lines. Therefore, in order to increase the transmission capacity, and to optimize the(More)
  • 1