André Naumann

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
Technology and product development have high priority in an advanced semiconductor manufacturing facility such as the Infineon Dresden fab. From the perspective of line performance this means that short cycle times for development lots have to be guaranteed to enable the required learning cycles. Long-term simulation is used in dynamic capacity planning to(More)
Material flow forecast based on Short-Term Simulation has been established as a decision support solution for fine-tuning of Preventive Maintenance (PM) timing at Infineon Dresden. To ensure stable forecast quality for effective PM decision making, the typical tool uptime behavior needs to be portrayed accurately. In this paper, we present a hybrid tool(More)
  • 1