Alexis Flores

Learn More
When control schemes based on finite control set model predictive control are experimentally implemented, a large amount of calculations is required, introducing a considerable time delay in the actuation. This delay can deteriorate the performance of the system if not considered in the design of the controller. In this paper, the problem is described, and(More)
In this work a new method is proposed for the diagnosis of faults in electric power transmission systems based on neural modularity. This method performs the diagnosis through the assignation of a generic neural module for each type of element conforming the transmission system, whether it be line, bus or transformer. A total of three generic neural modules(More)
  • 1