This paper presents testing and diagnostics of 40 MVA, 150/11.8 kV,Ynd5 main transformer and 4 MVA, 11.8/6.3 kV auxiliary transformer on PT. Indonesia Power Kamojang Geothermal Power Plan unit 1, that have been in operations for more than 25 years, since 1982. Although the main and auxiliary power transformer installed have been fulfilled their design life,(More)