Åke Andersson

Magnus Sjöström1
Simon C. Leemann1
Pedro F. Tavares1
1Magnus Sjöström
1Simon C. Leemann
1Pedro F. Tavares
Learn More
The MAX IV facility, currently under construction in Lund, Sweden, features two electron storage rings operated at 3 GeV and 1.5 GeV and optimized for the hard X-ray and soft X-ray/VUV spectral ranges, respectively. A 3 GeV linear accelerator serves as a full-energy injector into both rings as well as a driver for a short-pulse facility, in which undulators(More)
  • 1